Bearing

The Bearing Blog

Engineering•June 15, 2026

Why CRDTs are the Future of Collaborative Scheduling

How we solved the offline-sync problem for complex Critical Path Method networks using Automerge.

Read Article →
Engineering•May 28, 2026

How We Know the Schedule Is Right

Why we test the scheduling math against rules that can never be broken — and what that caught.

Read Article →
Industry•April 10, 2026

The Fallacy of the 'Soft' Dependency

Why a Gantt chart with arrows on it is not a critical path — and what your schedule stops telling you the moment the math goes soft.

Read Article →
Bearing Assistant1