Bearing
Built for the 10-person GC, not the Fortune 500

The scheduling rigor $50M firms hire consultants for. $199 a month, flat.

See which delay actually costs you the end date, bill straight from field-verified progress, and keep the RFIs, pay apps and daily reports in one place. Real CPM underneath — forward and backward pass, total and free float, multiple calendars. Ten seats, one published price, no implementation consultant.

Construction manager using Bearing in the field
Offline-Capable Field Capture

Built for the edge. Ready for the field.

Choose your workflow

Back Office & Scheduler

Real critical path, float and calendars, portfolio roll-up, and pay apps compiled straight from the schedule.

Explore Office Features

Field & Foreman

Master the "three-click" workflow with offline capabilities and instantaneous photo documentation.

Explore Field Features

Three places a job quietly loses money

The gap between the estimate and what the field actually built. The slip that moves your completion date. The paperwork trail that decides a dispute two years later. Bearing covers all three, in one place, for one price.

Predictable Margin Preservation

Most projects lose their margin in the cracks between the estimate, the schedule, and the actual field performance.

Bearing bridges the gap between your bid and your job site. By unifying your WBS with your financial reporting, you aren't just tracking progress—you are protecting your margin in real-time. We automate the reconciliation of field-verified progress against your budget, ensuring your billing is always accurate, current, and optimized for cash flow.

  • Eliminates data-entry lag
  • Makes financial reporting proactive, not reactive
  • Per-draw payment ledger — paid-to-date is always derived, never guessed
  • Cost ledger shows EAC and variance live — budget to committed to paid in one view
Predictable Margin Preservation - Portfolio Dashboard

Know Which Slip Costs You the End Date

Knowing you are behind schedule is not the same as knowing which delay costs you the end date.

A Gantt chart shows you the plan. A CPM engine tells you what a slip is going to cost. Bearing runs a full forward and backward pass every time the field reports in, so total and free float are current, the critical path reflects where the job actually is, and you can see which of today's three problems is the one that moves your completion date. Delays get logged against the activity they hit, with the weather and manpower record attached — so the schedule doubles as the evidence trail if the delay becomes a claim.

  • Total and free float on every activity — see which slack is real
  • Schedule advances from field actuals — critical path reflects where you are, not where you planned to be
  • Data-date progress override — out-of-sequence work reschedules correctly instead of quietly lying
  • Weather and delay log tied to the affected activity, ready for a time-impact claim
Strategic Risk De-risking - Gantt and Risk Analysis
New

Complete Project Documentation

A schedule without the paperwork trail is half a project. RFIs without a log become disputes. Punch lists in a notebook never get closed.

Bearing's documentation suite covers every record a small GC needs from the first drawing set to the final lien waiver — no bolt-ons, no separate subscriptions.

  • RFI log with ball-in-court tracking and overdue alerts
  • Photo-backed punch list — log deficiencies, assign trades, track closeout
  • Drawing register — always know which revision governs
  • Lien waiver manager — track conditional and unconditional waivers per pay period
Project Documentation — Live Status
RFI Log
14 RFIs
2 overdue · 3 pending response
Punch List
38 items
12 open · 26 complete
Drawing Register
Rev C current
47 sheets · 3 for review
Lien Waivers
Pay App #3
5 received · 1 missing

The Logic-Engine in Action

Bearing's CPM engine recalculates the critical path instantly as your schedule changes — no manual refresh, no guesswork.

Project: Alpha Core
AI Co-Pilot Active
Task A
Foundation
Days 1–14
7d float
Task B
Framing
Days 15–28
7d float
Task C
Roofing
Days 20–35
CRITICAL
Critical Path Recalculated

Linking Framing → Roofing consumes all remaining float and pushes the project 9 days past contract completion. All three activities are now critical. AI Co-Pilot suggests pulling forward material delivery to recover schedule.

Stop paying a penalty for every field seat

Per-seat pricing punishes you for putting software into the hands of foremen and subcontractors.

$1,068/mo
12 × $89/user/mo
$199/mo
Bearing Team — the same 12 people

A 12-person project team on a $89/user/mo plan costs $1,068 every month. Bearing Team covers your entire office and field crew for $199/mo flat.

Save over $10,400 per year with zero seat limits.

Transparent Pricing & ROI

Consolidate your fragmented software stack. Our price is on this page — see how much you save by switching.

TCO Calculator

5
$200

Includes fragmented tools for scheduling, CRM, and field-photo apps.

Current Annual Cost

$12,000

Bearing Annual Cost

$2,388
Total Annual Savings
$9,612

Simple Pricing for Small Firms

Professional CPM depth without the enterprise price tag or the implementation consultant.

Solo

One user, everything included
$49/mo

Full CPM scheduling and AI co-pilot for a single operator. No compromises.

  • Unlimited Projects
  • AI Co-pilot
  • True Offline CPM
  • G702/G703 Pay Apps
  • RFI Log & Drawing Register
  • Cost Ledger (EAC & Variance)
Get Started
MOST POPULAR

Team

Up to 10 users — one flat price
$199/mo

Your office PM, field foremen and subs on one platform. No per-seat surprises.

  • Everything in Solo
  • Team Collaboration
  • Subcontractor CRM & Lien Waivers
  • Punch List with Photo Attachments
  • Submittals & Daily Reports
  • Shared Project Templates
Get Started

Enterprise

Unlimited users
$499/mo

Portfolio management, multi-project cost roll-up, and the integration gateway.

  • Everything in Team
  • Unlimited Seats
  • Portfolio Pipeline Board
  • Aggregated Budget Roll-up
  • Multi-project Cost Tracking
  • Role-based Access Controls
Get Started

Need something bespoke — a custom SLA, or more than one company in a group? Talk to us at support@bearingcpm.com

How Bearing Stacks Up

Feature / CapabilityBearingProcoreBuildertrend
CPM Scheduling EngineForward/backward pass, total and free float, multiple calendars, data-date progressScheduling included; CPM depth varies by tierCalendar and task scheduling
Proof the Maths Is RightEvery release re-checked against the CPM and AIA billing rules before it shipsNot publishedNot published
Pay Apps From Schedule ProgressG702/G703 compiled from CPM earned value — no re-keyingInvoicing included; progress entered separatelyInvoicing included; not driven by a CPM engine
Field & Subcontractor SeatsIncluded — 10 seats on Team, unlimited on EnterpriseScoped to your annual construction volumePer-user tiers
Time to First ProjectSame day — no implementation engagementImplementation and onboarding programmeOnboarding programme
Pricing$199/mo flat, published on this pageQuote-based on annual construction volumeQuote-based
Bearing Assistant1